Typical Project Rail Transit The Automation Engineering Project for No.1 Line of Shenzhen Metro

The Automation Engineering Project for No.1 Line of Shenzhen Metro

No.1 Line of Shenzhen Metro totally has 18 stations, including 17 underground stations and one station on the ground; 2 pieces of 110kV transformer substations, the wiring mode for 110kV circuit is transformer group and cross line, 35kV line is single bus section. Our Company won the bidding of integrated automation and secondary equipment of two 110kV transformer stations and was responsible for design, supply and commissioning of integrated automation of two transformer substations, the whole system was put into production in March 2003, and the system has operated stably and reliably, which is highly praised by the users.

The continued construction project of No.1 Line of Shenzhen Metro totally has 15 stations, 1 car depot and 2 main transformer substations, including 13 underground stations; our Company was responsible for integration of intelligent environment control system for the whole underground station, supply and system integration and test for some equipment. And our Company also undertook supply and commissioning of LV multi-function instruments, and automatic switching power supply. At present, we have completed supply and commissioning of the equipment at test section.